                          Gujarat State Road Transport                            Bus Port                                           Form 1A 
                          Corporation (GSRTC) 
                           
                                                                             APPENDIX II 
                                                                              FORM-1 A  
                                                         CHECK LIST OF ENVIRONMENTAL IMPACTS 
                                                                                     
                           (Project proponents are required to provide full information and wherever necessary attach explanatory 
                             notes with the Form and submit along with proposed environmental management plan & monitoring 
                                                                             programme) 
                                                                                     
                            S.                           Item                                                Remark 
                            No. 
                           
                          1. LAND ENVIRONMENT 
                          1.1       Will the existing land use get significantly  No , the existing land will not get altered. 
                                    altered  from  the  project  that  is  not 
                                    consistent     with    the    surroundings?  The proposed project is the construction of Bus 
                                    (Proposed land use must conform to the  port. 
                                    approved  Master  Plan  /  Development 
                                    Plan of the area. Change of land use if  The project will be developed as per local landuse 
                                    any and the statutory approval from the  plan. 
                                    competent      authority    be    submitted).  
                                    Attach  Maps  of  (i)  site  location,  (ii)  surrounding features of the proposed site (within 
                                    surrounding features of the proposed site  500 meters) is provided in Annexure 3  
                                    (within  500  meters)  and  (iii)  the  site 
                                    (indicating    levels    &    contours)     to 
                                    appropriate scales. If not available attach 
                                    only conceptual plans. 
                          1.2       List out all the major project requirements  Site lay-out plan is provided in Annexure 4. 
                                    in terms of the land area, built up area,  Major requirements are  
                                    water  consumption,  power  requirement, 
                                    connectivity, community facilities, parking                        2
                                    needs etc.                                        Plot area  in m                                22,024 
                                                                                      Built-up  area  in                             57,211 
                                                                                         2
                                                                                      m  
                                                                                      Floor     Area     in                          32,642 
                                                                                         2
                                                                                      m,FSI 
                                                                                      Ground Coverage                                  8290 
                                                                                           2
                                                                                      in m  
                                                                                      No. of floors                             G+ 7 Floors  
                                                                                                            
                                                                                      Maximum height                                   29.55 
                                                                                      in m 
                                                                                      Basement area in                               20,673 
                                                                                         2
                                                                                      m  
                                                                                      Water                                          263.34 
                                                                                      requirement in 
                                                                                      KLD 
                                                                                      Power                                       4000 KVA 
                                                                                      requirement 
                                                                                    Proposed project is connected by 12 m and 30 m 
                                                                                    wide roads. 
                                                                                                        2
                          1.3       What  are  the  likely  impacts  of  the  About 5399.8 m  area will be developed as green 
                                    proposed activity on the existing facilities  and will have positive impact on the surrounding. 
                                    adjacent to the proposed site? (Such as  No  rare  or  endangered  species  of  fauna  are 
                                    open spaces, community facilities, details  reported to exist in the area. Care will be taken to 
                                    of  the  existing  land  use,  disturbance  to   minimize the disturbance to the local ecology. 
                                    the local ecology) 
                          1.4       Will   there  be  any  significant  land  There is no land disturbance due to the project.  
                                    disturbance      resulting     in    erosion,   
                                                                                                                                              1 
                                                                                                                                                
                           
                          Gujarat State Road Transport                              Bus Port                                            Form 1A 
                          Corporation (GSRTC) 
                           
                             S.                           Item                                                  Remark 
                            No. 
                                     subsidence & instability? (Details of soil  The Project area is categorized in the seismic zone 
                                     type,  slope  analysis,  vulnerability  to  III. The structural Design of the building is as per 
                                     subsidence, seismicity etc may be given).  Codes to negate the threat of environmental and 
                                                                                       other damages. 
                           1.5       Will  the  proposal  involve  alteration  of  No  natural  drainage  is  passing  through  project 
                                     natural  drainage  systems?  (Give  details  area. Moreover plot area is almost flat. 
                                     on  a  contour  map  showing  the  natural 
                                     drainage near the proposed project site) 
                                      
                                                                                                      3
                           1.6       What  are  the  quantities  of  earthwork  ~1,20,000 m  excavated earth will be generated. 
                                     involved  in  the  construction  activity  -      Top soil will be preserved and use for landscaping 
                                     cutting,  filling,  reclamation  etc.  (Give  purpose.  Other  earth  will  be  used  in  backfilling.  
                                     details  of  the  quantities  of  earthwork  Balance earth shall be disposed at low lying area 
                                     involved,  transport  of  fill  materials  from   designated by BAUDA. 
                                     outside the site etc.) 
                           1.7       Give  details  regarding  water  supply,  During construction period water will be supplied 
                                     waste      handling      etc    during      the  by tankers. 
                                     construction period.                              Onsite sanitation facilities will be provided for the 
                                                                                       workers  with  required  arrangements  as  per 
                                                                                       building     and      other    construction       workers 
                                                                                       (Regulation  of  Employment  and  Conditions  of 
                                                                                       Service) Act. 
                           1.8       Will  the  low-lying  areas  &  wetlands  get  No wetland and low-lying areas are found in the 
                                     altered? (Provide details of how low lying  vicinity of the project.  
                                     and wetlands  are  getting modified  from 
                                     the proposed activity) 
                           1.9       Whether  construction  debris  &  waste  Solid  waste  during  the  construction  phase 
                                     during construction cause health hazard?  comprised  mainly  of  excavated,  concrete  debris, 
                                     (Give  quantities  of  various  types  of  steel scrap, insulation material for air-conditioning 
                                     wastes  generated  during  construction  and packaging material. 
                                     including the construction labour and the 
                                     means of disposal)                                Top soil will be preserved and later used for green 
                                                                                       belt. The excavated soil will be use for backfilling. 
                                                                                       The  construction  waste  will  be  well  managed 
                                                                                       without causing any health hazard.  
                           2. WATER ENVIRONMENT 
                           2.1       Give    the    total   quantity     of   water  Total Fresh Water requirement for the project is 
                                     requirement for the proposed project with  135 KLD. 
                                     the breakup of requirements for various  The  details  of  water  requirement  &  its  breakup  
                                     uses.  How  will  the  water  requirement  water  demand  for  the  construction  &  operation 
                                     met? State the sources & quantities and  phase is provided in Annexure 5 
                                     furnish a water balance statement                  
                           2.2       What is the capacity (dependable flow or  Freshwater  during  operation  phase  shall  be 
                                     yield) of the proposed source of water?           provided by BAUDA. 
                           2.3      What is the quality of water required, in  Normally source of water supply will be met from 
                                    case, the supply is not from a municipal  BAUDA.  
                                    source?  (Provide  physical,  chemical, 
                                    biological  characteristics  with  class  of 
                                    water quality) 
                           2.4       How much of the water requirement can  Wastewater  will  be  collected  and  treated  in 
                                     be  met  from  the  recycling  of  treated  sewage  treatment  plant  and  will  be  used  for 
                                     wastewater?       (Give    the    details    of   flushing, horticulture. About 128.34 KLD of treated 
                                     quantities, sources and usage)                    waste  water  will  be  used.  Water  break  up  is 
                                                                                       attached wide  
                                                                                       Annexure 5 
                           2.5       Will  there  be  diversion  of  water  from  There will be no diversion from other users since 
                                     other users? (Please assess the impacts  the water demand is being met as a part of the 
                                                                                                                                                 2 
                                                                                                                                                   
                           
                          Gujarat State Road Transport                            Bus Port                                           Form 1A 
                          Corporation (GSRTC) 
                           
                            S.                           Item                                                Remark 
                            No. 
                                    of the project on other existing uses and  proposed project. 
                                    quantities of consumption) 
                          2.6       What  is  the  incremental  pollution  load  Maximum 183.6 KLD wastewater will be generated 
                                    from  wastewater  generated  from  the  from the proposed project. Break up of water is 
                                    proposed  activity?  (Give  details  of  the  attached vide Annexure 5. 
                                    quantities and composition of wastewater 
                                    generated from the proposed activity) 
                          2.7       Give  details  of  the  water  requirements  No 
                                    met  from  water  harvesting?  Furnish 
                                    details of the facilities created. 
                          2.8       What would be the impact of the land use  Rain  water  harvesting  details  are  provided  in 
                                    changes occurring due to the proposed  Annexure 6 
                                    project  on  the  runoff  characteristics 
                                    (quantitative as well as qualitative) of the 
                                    area in the post construction phase on a 
                                    long-term basis? Would it aggravate the 
                                    problems of flooding or water logging in 
                                    any way? 
                          2.9       What are the impacts of the proposal on  No   
                                    the ground water? (Will there be tapping 
                                    of  ground  water;  give  the  details  of 
                                    ground water table, recharging capacity, 
                                    and approvals obtained from competent 
                                    authority, if any) 
                          2.10      What precautions/measures are taken to  During  construction  phase,  on-site  sanitation 
                                    prevent  the  run-off  from  construction  facilities will be provided and domestic wastewater 
                                    activities polluting land & aquifers? (Give  will be disposed into soak pit  
                                    details  of  quantities  and  the  measures  No  run  off  will  be  disposed  outside  the  project 
                                    taken to avoid the adverse impacts)              boundary. 
                          2.11      How is the storm water from within the  During the post-construction stages, storm water 
                                    site  managed?  (State  the  provisions  will be collected into the surface drainage network 
                                    made  to  avoid  flooding  of  the  area,  inside the premises. The drain sizes and sections 
                                    details of the drainage facilities provided  will be designed in such a way that they can take 
                                    along with a site layout indication contour  the load of the peak rainfall period. All the surface 
                                    levels)                                          drains will be covered by gratings Proper surface 
                                                                                     gradient  will  be  provided  so  that  water  logging 
                                                                                     inside the campus does not occur.  
                                                                                     Collected rain water will be recharged into ground 
                                                                                     water. Details are provided in Annexure 6. 
                          2.12      Will  the  deployment  of  construction  The construction labourers will be hired from local 
                                    labourers particularly in the peak period  area. During construction phase, on-site sanitation 
                                    lead to unsanitary conditions around the  facilities will be provided. All the basic facilities will 
                                    project    site    (Justify    with    proper  be provided to labour. 
                                    explanation)  
                          2.13      What on-site facilities are provided for the  During the Construction phase, on-site sanitation 
                                    collection,  treatment  &  safe  disposal  of  facilities will be provided ( Septic tank and soak pit) 
                                    sewage? (Give details of the quantities of  During the operation phase, the total wastewater 
                                    wastewater        generation,       treatment  generation  is  estimated  to  be  183.6  KLD  The 
                                    capacities with technology & facilities for  wastewater will be treated into sewage treatment 
                                    recycling and disposal)                          plant.  
                          2.14      Give details  of dual plumbing  system  if  Yes  the  dual  plumbing  system  will  be  provided 
                                    treated waste used is used for flushing of    which will use treated water for flushing the toilets 
                                    toilets or any other use. 
                           
                          3. VEGETATION 
                          3.1       Is  there  any threat  of the  project to  the   No.  
                                    biodiversity?  (Give  a  description  of  the 
                                                                                                                                              3 
                                                                                                                                                
                           
                          Gujarat State Road Transport                              Bus Port                                            Form 1A 
                          Corporation (GSRTC) 
                           
                             S.                           Item                                                  Remark 
                            No. 
                                     local ecosystem with it’s unique features, 
                                     if any) 
                                      
                           3.2       Will  the  construction  involve  extensive  There are no endangered or significant flora fauna 
                                     clearing  or  modification  of  vegetation?    nearby site. 
                                     (Provide a detailed account of the trees &   
                                     vegetation affected by the project)                
                           3.3       What are the measures proposed to be  331  numbers  of  local  trees  will  be  planted  and 
                                     taken to  minimize  the  likely  impacts on  common area will be developed as green area.  
                                     important  site  features  (Give  details  of 
                                     proposal for tree plantation, landscaping, 
                                     creation of water bodies etc along with a 
                                     layout plan to an appropriate scale) 
                            
                           4. FAUNA 
                           4.1       Is there likely to be any displacement of  No scope of displacement of terrestrial as well as 
                                     fauna-  both  terrestrial  and  aquatic  or  aquatic  fauna  is  involved  due  to  the  proposed 
                                     creation of barriers for their movement?  construction. 
                                     Provide the details. 
                           4.2       Any  direct  or  indirect  impacts  on  the  No direct and indirect adverse impact is envisaged 
                                     avifauna of the area? Provide details.            to fauna due to the project 
                           .3        Prescribe  measures  such  as  corridors,  Not applicable 
                                     fish  ladders  etc  to  mitigate  adverse 
                                     impacts on fauna 
                                                                                        
                           5. AIR ENVIRONMENT 
                           5.1       Will  the  project  increase  atmospheric  No. Air Emissions will be  generated from vehicular  
                                     concentration of  gases  &  result  in heat  movement and DG sets in case of power failure.  
                                     islands? (Give details of background air   
                                     quality levels with predicted values based 
                                     on dispersion models taking into account 
                                     the  increased  traffic  generation  as  a 
                                     result of the proposed constructions) 
                           5.2       What are  the impacts  on  generation  of  Proposed  project  facilities  will  not  involve 
                                     dust,  smoke,  odorous  fumes  or  other  continuous  emission  during  operation  phase, 
                                     hazardous gases? Give details in relation  hence  minor  impact  envisaged  during  operation 
                                     to all the meteorological parameters.             phase. Emission will occur from stand by DG set. 
                                                                                        
                           5.3       Will  the  proposal  create  shortage  of   
                                     parking  space  for  vehicles?  Furnish  Parking Details are provided in Annexure 7 
                                     details  of  the  present  level  of  transport    
                                     infrastructure and measures proposed for 
                                     improvement        including     the     traffic 
                                     management at the entry  &  exit to  the 
                                     project site. 
                                      
                           5.4       Provide details of the movement patterns  Minimum  4.5m  wide  internal  circulation  will  be 
                                     with   internal    roads,    bicycle    tracks,  provided. 
                                     pedestrian pathways, footpaths etc., with 
                                     areas under each category. 
                                      
                           5.5       Will there be significant increase in traffic  Minimum  increase  in  noise  due  to  vehicular 
                                     noise  &  vibrations?  Give  details  of  the  movement  on  the  surrounding  area.  During  the 
                                     sources and the measures proposed for  project stage, Proper signage and trained staff will 
                                     mitigation of the above.                          be provided for traffic control. 
                                                                                        
                           5.6       What will  be  the  impact  of  DG  sets  &  It is proposed to install stand by silent DG set so 
                                                                                                                                                 4 
                                                                                                                                                   
The words contained in this file might help you see if this file matches what you are looking for:

...Gujarat state road transport bus port form a corporation gsrtc appendix ii check list of environmental impacts project proponents are required to provide full information and wherever necessary attach explanatory notes with the submit along proposed management plan monitoring programme s item remark no land environment will existing use get significantly not altered from that is consistent surroundings construction must conform approved master development area change if be developed as per local landuse any statutory approval competent authority submitted maps i site location surrounding features within meters provided in annexure iii indicating levels contours appropriate scales available only conceptual plans out all major requirements lay terms built up water consumption power requirement connectivity community facilities parking needs etc plot m floor fsi ground coverage floors g maximum height basement kld kva connected by wide roads what likely about green activity on have positi...

no reviews yet
Please Login to review.