Gujarat State Road Transport Bus Port Form 1A Corporation (GSRTC) APPENDIX II FORM-1 A CHECK LIST OF ENVIRONMENTAL IMPACTS (Project proponents are required to provide full information and wherever necessary attach explanatory notes with the Form and submit along with proposed environmental management plan & monitoring programme) S. Item Remark No. 1. LAND ENVIRONMENT 1.1 Will the existing land use get significantly No , the existing land will not get altered. altered from the project that is not consistent with the surroundings? The proposed project is the construction of Bus (Proposed land use must conform to the port. approved Master Plan / Development Plan of the area. Change of land use if The project will be developed as per local landuse any and the statutory approval from the plan. competent authority be submitted). Attach Maps of (i) site location, (ii) surrounding features of the proposed site (within surrounding features of the proposed site 500 meters) is provided in Annexure 3 (within 500 meters) and (iii) the site (indicating levels & contours) to appropriate scales. If not available attach only conceptual plans. 1.2 List out all the major project requirements Site lay-out plan is provided in Annexure 4. in terms of the land area, built up area, Major requirements are water consumption, power requirement, connectivity, community facilities, parking 2 needs etc. Plot area in m 22,024 Built-up area in 57,211 2 m Floor Area in 32,642 2 m,FSI Ground Coverage 8290 2 in m No. of floors G+ 7 Floors Maximum height 29.55 in m Basement area in 20,673 2 m Water 263.34 requirement in KLD Power 4000 KVA requirement Proposed project is connected by 12 m and 30 m wide roads. 2 1.3 What are the likely impacts of the About 5399.8 m area will be developed as green proposed activity on the existing facilities and will have positive impact on the surrounding. adjacent to the proposed site? (Such as No rare or endangered species of fauna are open spaces, community facilities, details reported to exist in the area. Care will be taken to of the existing land use, disturbance to minimize the disturbance to the local ecology. the local ecology) 1.4 Will there be any significant land There is no land disturbance due to the project. disturbance resulting in erosion, 1 Gujarat State Road Transport Bus Port Form 1A Corporation (GSRTC) S. Item Remark No. subsidence & instability? (Details of soil The Project area is categorized in the seismic zone type, slope analysis, vulnerability to III. The structural Design of the building is as per subsidence, seismicity etc may be given). Codes to negate the threat of environmental and other damages. 1.5 Will the proposal involve alteration of No natural drainage is passing through project natural drainage systems? (Give details area. Moreover plot area is almost flat. on a contour map showing the natural drainage near the proposed project site) 3 1.6 What are the quantities of earthwork ~1,20,000 m excavated earth will be generated. involved in the construction activity - Top soil will be preserved and use for landscaping cutting, filling, reclamation etc. (Give purpose. Other earth will be used in backfilling. details of the quantities of earthwork Balance earth shall be disposed at low lying area involved, transport of fill materials from designated by BAUDA. outside the site etc.) 1.7 Give details regarding water supply, During construction period water will be supplied waste handling etc during the by tankers. construction period. Onsite sanitation facilities will be provided for the workers with required arrangements as per building and other construction workers (Regulation of Employment and Conditions of Service) Act. 1.8 Will the low-lying areas & wetlands get No wetland and low-lying areas are found in the altered? (Provide details of how low lying vicinity of the project. and wetlands are getting modified from the proposed activity) 1.9 Whether construction debris & waste Solid waste during the construction phase during construction cause health hazard? comprised mainly of excavated, concrete debris, (Give quantities of various types of steel scrap, insulation material for air-conditioning wastes generated during construction and packaging material. including the construction labour and the means of disposal) Top soil will be preserved and later used for green belt. The excavated soil will be use for backfilling. The construction waste will be well managed without causing any health hazard. 2. WATER ENVIRONMENT 2.1 Give the total quantity of water Total Fresh Water requirement for the project is requirement for the proposed project with 135 KLD. the breakup of requirements for various The details of water requirement & its breakup uses. How will the water requirement water demand for the construction & operation met? State the sources & quantities and phase is provided in Annexure 5 furnish a water balance statement 2.2 What is the capacity (dependable flow or Freshwater during operation phase shall be yield) of the proposed source of water? provided by BAUDA. 2.3 What is the quality of water required, in Normally source of water supply will be met from case, the supply is not from a municipal BAUDA. source? (Provide physical, chemical, biological characteristics with class of water quality) 2.4 How much of the water requirement can Wastewater will be collected and treated in be met from the recycling of treated sewage treatment plant and will be used for wastewater? (Give the details of flushing, horticulture. About 128.34 KLD of treated quantities, sources and usage) waste water will be used. Water break up is attached wide Annexure 5 2.5 Will there be diversion of water from There will be no diversion from other users since other users? (Please assess the impacts the water demand is being met as a part of the 2 Gujarat State Road Transport Bus Port Form 1A Corporation (GSRTC) S. Item Remark No. of the project on other existing uses and proposed project. quantities of consumption) 2.6 What is the incremental pollution load Maximum 183.6 KLD wastewater will be generated from wastewater generated from the from the proposed project. Break up of water is proposed activity? (Give details of the attached vide Annexure 5. quantities and composition of wastewater generated from the proposed activity) 2.7 Give details of the water requirements No met from water harvesting? Furnish details of the facilities created. 2.8 What would be the impact of the land use Rain water harvesting details are provided in changes occurring due to the proposed Annexure 6 project on the runoff characteristics (quantitative as well as qualitative) of the area in the post construction phase on a long-term basis? Would it aggravate the problems of flooding or water logging in any way? 2.9 What are the impacts of the proposal on No the ground water? (Will there be tapping of ground water; give the details of ground water table, recharging capacity, and approvals obtained from competent authority, if any) 2.10 What precautions/measures are taken to During construction phase, on-site sanitation prevent the run-off from construction facilities will be provided and domestic wastewater activities polluting land & aquifers? (Give will be disposed into soak pit details of quantities and the measures No run off will be disposed outside the project taken to avoid the adverse impacts) boundary. 2.11 How is the storm water from within the During the post-construction stages, storm water site managed? (State the provisions will be collected into the surface drainage network made to avoid flooding of the area, inside the premises. The drain sizes and sections details of the drainage facilities provided will be designed in such a way that they can take along with a site layout indication contour the load of the peak rainfall period. All the surface levels) drains will be covered by gratings Proper surface gradient will be provided so that water logging inside the campus does not occur. Collected rain water will be recharged into ground water. Details are provided in Annexure 6. 2.12 Will the deployment of construction The construction labourers will be hired from local labourers particularly in the peak period area. During construction phase, on-site sanitation lead to unsanitary conditions around the facilities will be provided. All the basic facilities will project site (Justify with proper be provided to labour. explanation) 2.13 What on-site facilities are provided for the During the Construction phase, on-site sanitation collection, treatment & safe disposal of facilities will be provided ( Septic tank and soak pit) sewage? (Give details of the quantities of During the operation phase, the total wastewater wastewater generation, treatment generation is estimated to be 183.6 KLD The capacities with technology & facilities for wastewater will be treated into sewage treatment recycling and disposal) plant. 2.14 Give details of dual plumbing system if Yes the dual plumbing system will be provided treated waste used is used for flushing of which will use treated water for flushing the toilets toilets or any other use. 3. VEGETATION 3.1 Is there any threat of the project to the No. biodiversity? (Give a description of the 3 Gujarat State Road Transport Bus Port Form 1A Corporation (GSRTC) S. Item Remark No. local ecosystem with it’s unique features, if any) 3.2 Will the construction involve extensive There are no endangered or significant flora fauna clearing or modification of vegetation? nearby site. (Provide a detailed account of the trees & vegetation affected by the project) 3.3 What are the measures proposed to be 331 numbers of local trees will be planted and taken to minimize the likely impacts on common area will be developed as green area. important site features (Give details of proposal for tree plantation, landscaping, creation of water bodies etc along with a layout plan to an appropriate scale) 4. FAUNA 4.1 Is there likely to be any displacement of No scope of displacement of terrestrial as well as fauna- both terrestrial and aquatic or aquatic fauna is involved due to the proposed creation of barriers for their movement? construction. Provide the details. 4.2 Any direct or indirect impacts on the No direct and indirect adverse impact is envisaged avifauna of the area? Provide details. to fauna due to the project .3 Prescribe measures such as corridors, Not applicable fish ladders etc to mitigate adverse impacts on fauna 5. AIR ENVIRONMENT 5.1 Will the project increase atmospheric No. Air Emissions will be generated from vehicular concentration of gases & result in heat movement and DG sets in case of power failure. islands? (Give details of background air quality levels with predicted values based on dispersion models taking into account the increased traffic generation as a result of the proposed constructions) 5.2 What are the impacts on generation of Proposed project facilities will not involve dust, smoke, odorous fumes or other continuous emission during operation phase, hazardous gases? Give details in relation hence minor impact envisaged during operation to all the meteorological parameters. phase. Emission will occur from stand by DG set. 5.3 Will the proposal create shortage of parking space for vehicles? Furnish Parking Details are provided in Annexure 7 details of the present level of transport infrastructure and measures proposed for improvement including the traffic management at the entry & exit to the project site. 5.4 Provide details of the movement patterns Minimum 4.5m wide internal circulation will be with internal roads, bicycle tracks, provided. pedestrian pathways, footpaths etc., with areas under each category. 5.5 Will there be significant increase in traffic Minimum increase in noise due to vehicular noise & vibrations? Give details of the movement on the surrounding area. During the sources and the measures proposed for project stage, Proper signage and trained staff will mitigation of the above. be provided for traffic control. 5.6 What will be the impact of DG sets & It is proposed to install stand by silent DG set so 4
no reviews yet
Please Login to review.