133x Filetype PDF File size 2.26 MB Source: www.indresinc.com
CABLE SPLICING AND TERMINATION TRAINING SYSTEM EQUIPMENT MAINTENANCE DESCRIPTION (IRI-EM19) INDUSTRIAL RESOURCES, INC. A TRAINING SERVICES COMPANY ©This document is the property of Industrial Resources, Inc. Copies and distribution of this document is prohibited unless written authorization is granted by Industrial Resources, Inc. Cable Splicing and Termination (IRI-EM19) PREFACE This Training Equipment Maintenance Description (EMD) has been designed to assist you in meeting the requirements of Module IRI-EM19 of the Electrical Distribution Training Program. It contains information about the Power Plant, Cable Splicing and Termination. This includes function, quantity of parts, location of parts, description of the physical construction of the part, and description of the operation of the part, equipment preventive and corrective maintenance, and references. You should review each chapter objective. In doing so you will be better prepared to learn the required information. You should also inspect the equipment identifying the components and controls. Should you have additional questions about the equipment, ask your supervisor. A separate document, Cable Splicing and Termination Equipment Maintenance Procedure (IRI- EM19-EMP), covers detailed maintenance of the Cable Splicing and Termination. Page 1 Cable Splicing and Termination (IRI-EM19) CABLE SPLICING AND TERMINATION TRAINING EQUIPMENT MAINTENANCE DESCRIPTION TABLE OF CONTENTS 1.0 Introduction ......................................................................................................................... 5 1.1 Equipment Function ............................................................................................................ 5 1.2 Equipment Description ....................................................................................................... 5 1.3 Equipment Connections and Interface ................................................................................ 6 2.0 Equipment Major Parts ....................................................................................................... 7 2.1 Cable Splicing and Termination Equipment ....................................................................... 7 2.2 Preparing the Cable for Termination .................................................................................. 9 2.3 Attaching the Cable Lug ................................................................................................... 14 2.4 Cleaning the Cable ............................................................................................................ 15 2.5 Applying Stress Relief Material to the Cable ................................................................... 16 2.6 Positioning and Shrinking the Stress Relief Tube on the Cable ....................................... 16 2.7 Grounding the Cable Shield .............................................................................................. 18 2.8 Applying Sealant to the Cable .......................................................................................... 20 2.9 Placing and Shrinking the HV Tube on the Cable ............................................................ 21 2.10 Completing Outdoor Termination of the Cable ................................................................ 22 3.0 Equipment Preventive and Corrective Maintenance ......................................................... 25 3.1 Cable Splicing and Termination Preventive Maintenance................................................ 25 3.2 Cable Splicing and Termination Corrective Maintenance ................................................ 25 4.0 References .......................................................................... Error! Bookmark not defined. Appendix 1 - Cable Splicing and Termination Kits..................................................................... 26 Page 2 Cable Splicing and Termination (IRI-EM19) List of Figures: Figure 1 – Determining the Required Amount of Insulation Cutback Figure 2 – Insulation Cutback for Cable Shielded with Copper Tape Figure 3 – Installing Ground Braid on Cable Shielded with Copper Tape Figure 4 – Insulation Cutback for Cable Shielded with Wire Figure 5 – Installing the Lug on Wire Shielded Cable Figure 6 – Insulation Cutback for Cable with UniShield Figure 7 – Installing Lug for Cable with UniShield Figure 8 – Insulation Cutback for Cable with Lead Sheath Figure 9 – Soldering the Ground Braid for Cable With Lead Sheath Figure 10 – Positioning the Ground Braid for Cable with Lead Sheath Figure 11 – Applying Red Sealant to Lug Barrel Figure 12 – Installing the Shim Tube Figure 13 – Abrading and Cleaning the Cable Figure 14 – Applying Stress Relief Material to Cable Figure 15 – Positioning and Shrinking Stress Relief Tube Figure 16 – Preparing to Ground Cable with Copper Tape or Lead Sheath Figure 17 – Applying Red Sealant to Cable Figure 18 – Applying More Red Sealant to Cable Figure 19 – Preparing to Ground Wire Shield or UniShield Figure 20 – Cleaning the Jacket for Wire Shield or UniShield Figure 21 – Continue Wrapping Red Sealant for Wire Shield or UniShield Figure 22 – Applying Sealant to Cable at Lug Figure 23 – Applying Sealant to Cable with No Lug Figure 24 – Placing and Shrinking HV Tube on Cable Figure 25 – Trimming the HV Tube on Cable Figure 26 – Positioning Skirt on Cable Figure 27 – Positioning Skirt for Top Feed Termination Figure 28 – Adding Extra Skirts on Cable Page 3
no reviews yet
Please Login to review.