                                                                                                                            BILL  OF  QUANTITIES
                                                                                              Gabion wall construction for protection of TLC in different districts and locations
                                                                                                                                                                                                                                                                    Page 1 of 5
       Item                                                                                                                                                  Total                                   Rate / Units (NPR)             Amount
                                                                               Kalika             Shree         Shree Srijansil    Gahate Ni Ma V, 
                                     Description                             Elementary       Suryamukhi       LSS, Shakhauri,       Bahuntipling, 
       No.                                                                School, Babala,      Elementary           sindhuli            sindhuli           Quantity              Unit               In Fig.         In Words         (NPR)
                                                                              Sindhuli      School, Sindhuli
        1    SITE CLEARANCE
       1.1   Site Clearance (to make the bed surface of gabion                           1                 1                   1                   1                4.00         L.S
             positioning)
        2    EARTH WORK
       2.2   E/W in excavation for structures in common
             soil, lead 50.0 m, lift upto 3.0m, all complete                           16                 16                  11                  16               59.00          m³
        3    GABION AND STONE WORKS
       3.1   Supplying, fabrication, assembling, placing in
             position of gabion box consisting of hexagonal
             mesh size 100 x100mm, including rolling, cutting,
             weaving with 10 SWG wire, binding the gabions
             together and tying down the lids with binding wire
             12 SWG, all complete.
             2x1x1m Box                                                                32                 32                  22                  32              118.00         box
       3.2   Supply and Filling stones in gabions, all complete                        64                 64                  44                  64              236.00          m³
                                               Page Total   :
                                                                                                                                                                                              Total  Cost page 1:  
                                                                                                                                                                                              Transportation cost page 1
                                                                                                                                                                                              Page 1 Total
                                                                                                              BILL  OF  QUANTITIES
                                                                                  Gabion wall construction for protection of TLC in different districts and locations
                                                                                                                                                                                                                                                       Page 2 of 5
      Item                                                                                                     Total                                   Rate / Units (NPR)                Amount
                                   Description                         Bishnu Pra Vi.,   Shanka Devi 
       No.                                                                 Gorkha       Pra. Vi., Gorkha     Quantity              Unit             In Fig.          In Words             (NPR)
        1   SITE CLEARANCE
       1.1  Site Clearance (to make the bed surface of gabion                       1                 1                2.00        L.S
            positioning)
        2   EARTH WORK
       2.2  E/W in excavation for structures in common
            soil, lead 50.0 m, lift upto 3.0m, all complete                        16                26               42.00         m³
        3   GABION AND STONE WORKS
       3.1  Supplying, fabrication, assembling, placing in
            position of gabion box consisting of hexagonal
            mesh size 100 x100mm, including rolling, cutting,
            weaving with 10 SWG wire, binding the gabions
            together and tying down the lids with binding wire
            12 SWG, all complete.
            2x1x1m Box                                                             32                52               84.00        box
       3.2  Supply and Filling stones in gabions, all complete                     64              104               168.00         m³
                                             Page Total   :
                                                                                                                                               Total  Cost page 2:  
                                                                                                                                          Transportation cost page 2
                                                                                                                                               Page 2 Total
                                                                                                         BILL  OF  QUANTITIES
                                                             Gabion wall construction for protection of TLC in different districts and locations
                                                                                                                                                                                                                             Page 3 of 5
      Item                                                     Dowongpokhari                      Jankalyan                                           Total                            Rate / Units (NPR)     Amount
                                                                Basic School,   Samaj Bikash     Secondary      Shree Janashakti  Ganesh Ma Vi, 
      No.                      Description                     Sindhupalchow       Pra V,          School,         PS, Kavre      Ganeshthan,       Quantity            Unit          In Fig.    In Words      (NPR)
                                                                      k       Sindhupalchowk     Ghartichap,                        Nuwakot
                                                                                                   Kavre
       1   SITE CLEARANCE
      1.1  Site Clearance (to make the bed surface of gabion               1               1                1                1               1               5.00       L.S
           positioning)
       2   EARTH WORK
      2.2  E/W in excavation for structures in common
           soil, lead 50.0 m, lift upto 3.0m, all complete                16              16               11               16              16              75.00       m³
       3   GABION AND STONE WORKS
      3.1  Supplying, fabrication, assembling, placing in
           position of gabion box consisting of hexagonal
           mesh size 100 x100mm, including rolling, cutting,
           weaving with 10 SWG wire, binding the gabions
           together and tying down the lids with binding wire
           12 SWG, all complete.
           2x1x1m Box                                                     32              32               22               32              32             150.00       box
      3.2  Supply and Filling stones in gabions, all complete             64              64               44               64              64             300.00       m³
                                        Page Total   :
                                                                                                                                                                                   Total  Cost page 3:  
                                                                                                                                                                             Transportation cost page 3
                                                                                                                                                                                   Page 3 Total 
                                                                                                                      BILL  OF  QUANTITIES
                                                                    Gabion wall construction for protection of TLC in different districts and locations
                                                                                                                                                                                                                                                       Page 4 of 5
      Item                                                              Bulungkhani     Shree Mahadev        Shree Man       Devistan Lower  Chhiringe Basic           Total                                Rate / Units (NPR)        Amount
                                   Description                         Pra.vi, Bulung,  Pra V, Sailung,   Mohan sikshya         Secondary           School, 
       No.                                                                Dolakha           Dolakha         Sadan pra v,         School,       Bijulikot,Ramec       Quantity              Unit            In Fig.      In Words       (NPR)
                                                                                                              Dolakha         Okhaldhunga            hhap.
        1   SITE CLEARANCE
       1.1  Site Clearance (to make the bed surface of gabion                       1                 1                  1                  1                 1                5.00         L.S
            positioning)
        2   EARTH WORK
       2.2  E/W in excavation for structures in common
            soil, lead 50.0 m, lift upto 3.0m, all complete                        11                11                 11                 16               16                65.00         m³
        3   GABION AND STONE WORKS
       3.1  Supplying, fabrication, assembling, placing in
            position of gabion box consisting of hexagonal
            mesh size 100 x100mm, including rolling, cutting,
            weaving with 10 SWG wire, binding the gabions
            together and tying down the lids with binding wire
            12 SWG, all complete.
            2x1x1m Box                                                             22                22                 22                 32               32               130.00         box
       3.2  Supply and Filling stones in gabions, all complete                     44                44                 44                 64               64               260.00         m³
                                             Page Total   :
                                                                                                                                                                                                        Total  Cost page 4:  
                                                                                                                                                                                                 Transportation cost page 4
                                                                                                                                                                                                        Page 4 Total 
The words contained in this file might help you see if this file matches what you are looking for:

...Bill of quantities gabion wall construction for protection tlc in different districts and locations page item total rate units npr amount kalika shree srijansil gahate ni ma v description elementary suryamukhi lss shakhauri bahuntipling no school babala sindhuli quantity unit fig words site clearance to make the bed surface l s positioning earth work e w excavation structures common soil lead m lift upto all complete stone works supplying fabrication assembling placing position box consisting hexagonal mesh size xmm including rolling cutting weaving with swg wire binding gabions together tying down lids xxm supply filling stones cost transportation bishnu pra vi shanka devi gorkha dowongpokhari jankalyan basic samaj bikash secondary janashakti ganesh sindhupalchow ps kavre ganeshthan k sindhupalchowk ghartichap nuwakot bulungkhani mahadev...

no reviews yet
Please Login to review.