155x Filetype PDF File size 2.65 MB Source: forestsclearance.nic.in
Environment Management Plan Near Village Tehsil District Gopalpura Sarmathura Dholpur 1 Environment Management Plan The environmental management plan consists of a set of mitigation, management, monitoring and institutional measure to be taken during implementation and operation of the project, to eliminate adverse environmental impact or reduce them to acceptable levels. The present environmental management plan addresses, the component of environment, which are likely to be affected by the different operation in cluster of Sandstone mine. The objectives of EMP area:- Overall conservation of environment. Minimization of waste generation and pollution. Judicious use of natural resources and water. Safety, welfare and good health of the work force and populace. Ensure effective operation of all control measures. Vigilance against probable disasters and accidents. Monitoring of cumulative and long term impacts. Ensure effective operation of all control measures. S. No M.L. No. 1 60/89[17/09(R)] 2 Cluster Baseline information: For the preparation 60/89[17/09(R)] mine data is taken for preparation 3 Water regime The average annual rainfall in the area is not exceeds 300-460mm per year. Surface water:-Ram Sagar-14.5 Km NE, Angai Dam-13 Km, NW,Chambal River-9 Km S, Bandhe Nadi-4.5 Km NE, Janghal Nadi-11.5 Km NE. Gground water:-. The Ground water table is 40m (in rainy season) to 45m (in Dry Season). Flora and fauna There are few shrubs & other bushes exist in the lease area. No Fauna exist in the lease area. Quality of air, ambient noise level and water The quality of air could be said quite clean and natural, free from any harmful gases arising out of any industrial establishment/ complex including mining ventures. The area in and around the mine could be said free from any nuisance of repetitive nature such as noise. Thus, it is quite calm. The noise level is also not much high. Climatic conditions The Climate of the area is dry with extreme temperature variation i.e. in summer as 0 0 high as 47 C and in winter 5 C. Human settlements Total Sr. Total_ Total Total Total Total Total Non no. Name HH Total_P Male Female Lit. Ilit. Worker Worker 1 Kankrai 167 1058 579 479 409 649 656 402 2 Naksauda 131 844 471 373 333 511 518 326 3 Khidarpur 56 406 230 176 115 291 245 161 4 Dhaundh 138 945 544 401 243 702 312 633 5 Bidarpur 36 257 149 108 101 156 144 113 6 Gopalpura 143 960 550 410 466 494 650 310 7 Maharajpura 97 662 387 275 383 279 352 310 4
no reviews yet
Please Login to review.