jagomart
digital resources
picture1_Construction Template Excel 40185 | 0080 01   Plantation Rd   Phase Ii   Pces Estimate


 321x       Filetype XLSX       File size 1.24 MB       Source: smartportal.virginiahb2.org


File: Construction Template Excel 40185 | 0080 01 Plantation Rd Phase Ii Pces Estimate
sheet 1 draft upc project cost estimating system draft estimate enter project data required to compute a draft estimate district salem project number 008001 upc 008001 project manager david holladay ...

icon picture XLSX Filetype Excel XLSX | Posted on 14 Aug 2022 | 3 years ago
Partial file snippet.
Sheet 1: DRAFT











UPC: ****
















Project Cost Estimating System



Draft Estimate

















ENTER PROJECT DATA REQUIRED TO COMPUTE A DRAFT ESTIMATE

















District:


SALEM

















Project Number:


0080-01

















UPC:


0080-01

















Project Manager:


David Holladay

















Project Description:


Plantation Road Improvements Phase 2























Sheet 2: SUMMARY






UPC: ****











Project Cost Estimating System








SUMMARY PAGE













DISTRICT
SALEM












PROJECT NUMBER
0080-01












CONSTRUCTION END YEAR
FY2024 UPC 0080-01












AD YEAR
FY2022 RATE OF
INFLATION TO AD
12.59%












ESTIMATE YEAR
FY2017 INFLATION RATE DURING CN N/A










Date of previous estimate
N/A














PROJECT MANAGER / DESIGNER
David Holladay












Preliminary Engineering Estimate:
MANUAL













Construction Estimate:
MANUAL






















Right-of-Way Estimate:
MANUAL






















Utilities Estimate:
MANUAL






















DATE
8/14/2022














THE FOLLOWING DATA WILL BE PROVIDED UPON COMPLETION OF THE REMAINDER OF THE



WORKBOOK, WHICH IS ACCESSED BY SELECTING THE CONST, RW, & UTIL TABS BELOW



Bridge PE ESTIMATE
$0










Bridge CN ESTIMATE
$0










Bridge RW ESTIMATE
$0










PRELIMINARY ENGINEERING ESTIMATE (excluding Bridge PE)
$124,723










CONSTRUCTION ESTIMATE (excluding Bridge CN)
$1,593,891










RIGHT-OF-WAY & UTILITIES ESTIMATE(excluding Bridge RW)
$33,600


















TOTAL PROJECT ESTIMATE (excluding Bridge estimate)
$1,752,214


















© Virginia Department of Transportation 2005







Revised 02/16/16
Estimate Class: Blank Version 6.10






























The words contained in this file might help you see if this file matches what you are looking for:

...Sheet draft upc project cost estimating system estimate enter data required to compute a district salem number manager david holladay description plantation road improvements phase summary page construction end year fy ad rate of inflation during cn na date previous designer preliminary engineering manual rightofway utilities the following will be provided upon completion remainder workbook which is accessed by selecting const rw amp util tabs below bridge pe excluding total copy virginia department transportation revised class blank version...

no reviews yet
Please Login to review.