245x Filetype XLS File size 0.12 MB Source: www2.calstate.edu
Sheet 1: Instructions
Completing the Design-Bid-Award A/E Exhibits | |||
Legend: | |||
[Insert…] | Edit/Insert project information as indicated. | ||
A data entry cell. User to enter appropriate information. | |||
Formatting is automatic. Do not enter commas or '$' signs. | |||
A calculated cell. Values generated by formula based on values entered in select data entry cells. | |||
Formatting is automatic. Do not enter commas or '$' signs. | |||
Building Fee Schedule Classification | |||
Header | Edit/insert agreement number, project name, and name of service provider in header of worksheet. | ||
Cell D6 | Enter the single digit building schedule classification that most completely represents the project. This is either 0, 1, 2, 3, 4, or 5. Enter or leave 0 (zero) for building type where no dollar value is listed. | ||
Exhibit B Schedule of Lump Sum Fees for Design-Bid-Award Projects | |||
Header | Edit/insert agreement number, project name, and name of service provider in header of worksheet. | ||
Cell E14 | Edit the placeholder value for New Construction. Enter 0 (zero) when none. This value is the Item 5 'Subtotal: Building, Sitework and Escalation" in the 2-7. It includes Item 1 'Total Building', Item 2 'Total Site work' and Item 4 'Escalation'. Enter or leave 0 (zero) if there is no dollar value. | ||
Cell F14 | Edit the placeholder value for Building Fee Type. A value of 1, 2, 3, 4, or 5 must be entered to calculate fees. A entry of zero here will return a 'zero' for fee. | ||
Cell E16 | Edit the placeholder value for Renovation Construction. Enter 0 (zero) when none. This value is the Item 5 'Subtotal: Building, Sitework and Escalation' in the 2-7. It includes Item 1 'Total Building', Item 2 'Total Site work' and Item 4 'Escalation'. Enter or leave 0 (zero) if there is no dollar value. | ||
Cell F16 | Edit the placeholder value for Building Fee Type. A value of 1, 2, 3, 4, or 5 must be entered to calculate fees. A entry of zero here will return a 'zero' for fee. | ||
Exhibit C Project Design Schedule | |||
Header | Edit/insert agreement number, project name, and name of service provider in header of worksheet. | ||
Dates | Enter desired dates (dd/mm/yy). These are the original target dates. The Agreement describes how these dates shall be further defined and adjusted during the course of the project. | ||
Exhibits D Submittal Requirements & Procedure Guide for CSU Capital Projects | |||
Download current Pro Guide edition from CPDC A/E website, This is Exhibit D. Attach it, along with the completed Agreement, Rider A, and Exhibits A, B, C, and E to complete the Agreement package. | |||
Exhibits E Architect/Engineer Hourly Rate Schedules Applicable to this Project | |||
Include the Architect's and their Normal Consulting Engineer's hourly rates schedules applicable to the project. Assemble and label each 'Exhibit E, Page x of y'. |
BUILDING SCHEDULE CLASSIFICATION | ||||||
This project is classified as a Schedule | 2 | Building for purposes of fee calculation. | ||||
Schedule 1 | Schedule 3 - continued | |||||
101 | Monuments | 317 | Industrial Arts | |||
102 | Entrance Structure | 318 | Language Arts | |||
103 | Bridges | 319 | Music | |||
104 | Other | 320 | Physical Education/ Gymnasium/ Dance Studios | |||
321 | Psychology | |||||
Schedule 2 | 322 | Social Science | ||||
201 | Biological Science | 323 | Other | |||
202 | Cafeteria | |||||
203 | College Union | |||||
204 | Computer Facility | Schedule 4 | ||||
205 | Health Clinic | 401 | Amphitheater | |||
206 | Little Theater & Auditorium (<500 seats) | 402 | Parking Lot | |||
207 | Library/ Information Resource Center | 403 | Parking Structure | |||
208 | Museum & Gallery | 404 | Residence/Student Housing | |||
209 | Performing Arts Facility/ Theatre (500+ seats) | 405 | Site Development | |||
210 | Physical Science | 406 | Stadium | |||
211 | Student Recreation Center | 407 | Utilities/ Infrastructure/ Telecom | |||
212 | Other | 408 | Other | |||
Schedule 3 | Schedule 5 | |||||
301 | Administration | 501 | Corporation Yard (warehouses) | |||
302 | Agriculture | 502 | Farm Building (simple) | |||
303 | Aquatic Facility | 503 | Other | |||
304 | Art | |||||
305 | Asbestos Abatement/Alterations | |||||
306 | Bookstore | |||||
307 | Business Admin./ Student Business Services | |||||
308 | Central Heating and Cooling Plant | |||||
309 | Child Care | |||||
310 | Cogeneration Buildings & Equipment | |||||
311 | Corporation Yard (shops) | |||||
312 | Education | |||||
313 | Engineering | |||||
314 | Faculty Offices | |||||
315 | Home Economics | |||||
316 | Humanities |
Exhibit B | |||||||||
SCHEDULE OF LUMP SUM FEES for DESIGN-BID-AWARD PROJECTS | |||||||||
ARCHITECTS/ENGINEER'S BASIC SERVICES | |||||||||
Date: | |||||||||
Project: | [Insert] | This is a look up table | |||||||
Campus: | [Insert] | Not necessary to print | |||||||
A/E: | [Insert] | ||||||||
A/E FEE CALCULATION | Construction | Building Type | A/E | A/E Fee as a % | Fee Calculation Information | ||||
Budget | (0,1,2,3,4, or 5) | Fee | of Construction (3) | LOG Calculations & Coefficients | |||||
New Construction | $0 | 0 | Err:502 | ||||||
Renovation Construction | $0 | 0 | Err:502 | ||||||
Err:502 | |||||||||
Total A/E Construction Budget | $0 | Err:502 | |||||||
Err:502 | |||||||||
A/E FEE PAYMENT SCHEDULE (1) | |||||||||
Schematic | Preliminary | Construction | Construction | Record | |||||
Total | Design | Design | Documents | Bidding | Administration (2) | Drawings | |||
100% | 25% | 15% | 35% | 2% | 21% | 2% | Fee value to 2 places | ||
$0.00 | |||||||||
at 25% | - | - | |||||||
at 50% | Monthly | At 100% | |||||||
at 75% | - | - | |||||||
at 100% | |||||||||
Notes: | |||||||||
#1) Fee formula is described at CPDC A/E website: | |||||||||
http://www.calstate.edu/cpdc/Suam/Appendices/Appendix_C.shtml | |||||||||
#2) Construction Administration fee paid in monthly payments | |||||||||
equal to the percentage of project's construction completion. | |||||||||
#3) Fee percentage falls logarithmically as project construction costs increases. | |||||||||
Fee percentage is a result of the fee calculation. It is not the originator of the fee. | |||||||||
Fee Summary | |||||||||
P | Schematics + Design Development | ||||||||
W | Construction Documents + Bidding | ||||||||
C | Const. Admin. + Rec. Dwgs. | ||||||||
TOTAL | Total PWC | ||||||||
no reviews yet
Please Login to review.